Industry: data centers

Visitor management for data centers.

Colocation halls, enterprise data rooms and network sites get a steady flow of customer engineers, vendor technicians and auditors. Each one should be expected, approved, checked and logged before they reach the floor. BeckonDesk does that at the entrance and keeps the record your auditors ask for.

At the entrance

  • Every visit approved before arrival. The host or reception pre-registers the visitor, and visitor types can require approval first. The visitor gets a QR pass by email. Engineers on a multi-day job get one pass that works each day until the date you set.
  • NDA and site rules signed before entry. The agreement is signed on the pass before arrival or at the kiosk. Sign-in questions, such as whether the visitor is carrying removable media, can hold the visit for approval when the answer needs a second look.
  • Contractors checked at the door. Electricians, HVAC and fire suppression firms scan their contractor pass. The kiosk refuses entry, and sends them to reception, if certificates, inductions or company insurance are not in order, and shows any live permit to work at check-in. See contractor compliance.
  • Screened against sanctions lists. Names and companies are checked at pre-registration and at sign-in against OFAC's SDN List, the US Consolidated Screening List and the UN, EU and UK lists.
  • Doors, if you want them. If your door controller accepts webhooks, BeckonDesk can send a grant on sign-in and a revoke on sign-out.
  • Lockdown and duress. Reception can lock the site down, which stops kiosk sign-ins and alerts administrators, and a silent duress code raises the alarm without showing on screen. See lockdown and duress.

What auditors test

  • SOC 2. The Trust Services Criteria do not prescribe log fields. Auditors test whether your own visitor procedure ran for the whole period, so they sample dates and ask for the records. See SOC 2 and ISO 27001 visitor access evidence.
  • ISO/IEC 27001:2022. Annex A control 7.2 (physical entry) requires secure areas to be protected by entry controls. The log format is yours to decide.
  • PCI DSS v4.0. Where cardholder data is stored or processed, Requirement 9.3.4 asks for a visitor log with the visitor's name, the organization they represent and the onsite person who authorized access, kept for at least three months unless law says otherwise. See PCI DSS Requirement 9 visitor controls.

BeckonDesk exports the visitor log, the audit trail and a 30-day evidence pack as CSV, and deletes visit records after the retention period you set.

What BeckonDesk does not do

It does not control mantraps or turnstiles directly, read badge-in events from your access control system, take photos, use biometrics, track escorts or record which cage or rack a visitor reached. Keep your access control system for the floor; BeckonDesk handles who was let in at the front door and why.

Questions people ask

What should a data center visitor log record?

The visitor's name, company, the person who authorized or hosted the visit, and the time in and time out. If cardholder data is on site, PCI DSS Requirement 9.3.4 names those fields and asks for at least three months of retention.

Can visitors sign an NDA before they arrive?

Yes. In BeckonDesk the agreement can be signed from the emailed pass before the visit, so the visitor does not hold up the entrance.

Does BeckonDesk replace our access control system?

No. It signs people in, checks and logs them at the entrance, and can send grant and revoke messages to a door controller that accepts webhooks. Badge-in events inside the building stay in your access control system.

Related reading

Set up a data hall visit in a walkthrough.

Thirty minutes: an approval-required visitor type, an NDA signed from the pass, a contractor check at the kiosk and the CSV your auditor would see.

Start free trial Book a walkthrough